ENR Southwests Top Starts of 2011

Text size: A A
Top Starts In the Southwest
 
Rank Project LocationProject CostStart Date/ End DateOwner Project team
1Intel Fab 42 Semiconductor Manufacturing Facility Chandler, Ariz.$5 billion2Q 2011/ 2013Intel Corp.Design IDC ArchitectsGC Hoffman Construction Co.
2Solana Solar Generating Station Plant Gila Bend, Ariz.$1.6 billionMay 2011/2013Abengoa Solar Inc./Arizona Solar OneDesign-Build Abener/Teyma Joint Venture
3Crescent Dunes Solar Energy Project Nye County, Nev.$900 millionAug. 2011/Summer 2013SolarReserveDesign Pratt & Whitney RocketdyneGC Cobra Thermosolar Plants Inc.
4One Nevada Transmission Line (ON Line) Ely, Nev.$510 million1Q 2011/Early 2013NV EnergyDesign Power Engineers Inc.GC Sturgeon Electric Co. (lines); Wilson Utility Construction
5Patua Geothermal Power PlantFernley, Nev.$300 millionAug. 2011/Late 2012Gradient ResourcesDesign-Build SAIC Constructors
6Spring Valley Wind Farm & Electrical Substation Ely, Nev.$250 millionAug. 2011/June 2012Pattern Energy GroupGC Mortenson Construction
7First Solar Manufacturing Plant Mesa, Ariz.$200 millionMay 2011/3Q 2012First Solar Inc.Design First Solar Inc.GC M+W Group
832 MGD Water Reclamation CampusTucson, Ariz.$172.3 millionJune 2011/May 2014Pima County RWRDDesign-Build-Operate CH2M HILL
9I-10/SR 303L Traffic InterchangePhoenix, Ariz.$133.9 millionNov. 2011/May 2014Ariz. Dept. of TransportationDesign AZTEC EngineeringGC Pulice Construction
10303L, Peoria Ave. to Mountain View Blvd.Surprise, Ariz.$128.7 millionAug. 2011/Oct. 2013Ariz. Dept. of TransportationDesign Premier Engineering; Ritoch-Powell & AssociatesGC Pulice Construction
11Chandler Regional Medical Center Tower ExpansionChandler, Ariz.$125 millionDec. 2011/4Q 2014Dignity HealthDesign Orcutt|WinslowGC Kitchell
12Sky Harbor Airport SkyTrain Phase 1APhoenix, Ariz.$120 millionAug. 2011/May 2014City of Phoenix Aviation Dept.Design Gannett Fleming Inc.GC McCarthy Bldg. Cos. Inc. & Kiewit Western Co. Joint Venture
13Rte. 215 Bruce Woodbury Beltway, Tenaya Way to Decatur Blvd.Las Vegas, Nev.$116.8 millionOct. 2011/April 2014Clark County Public WorksDesign G.C. WallaceGC Las Vegas Paving Corp.
14Harmon CornerLas Vegas, Nev.$100 millionMay 2011/Dec. 2011 (shell only)BPS PartnersDesign SH ArchitectureGC PENTA Building Group
15McCarran Air Traffic Control TowerLas Vegas, Nev.$99 millionJune 2011/Early 2015Federal Aviation Admin. - Western Pacific RegionDesign WHPacificGC Archer Western Contractors
16Twin Arrows Navajo Resort & CasinoFlagstaff, Ariz.$92 millionSept. 2011/Sept. 2012SiconDesign Friedmutter GroupGC Hunt Construction Group
17I-10 Widening, Ruthrauff to Prince Rd.Tucson, Ariz.$76.4 millionSept. 2011/Late 2013Ariz. Dept. of TransportationDesign AECOMGC Pulice Construction
18I-80, Robb Dr. Interchange to Vista Blvd. InterchangeReno, Nev.$72 millionMay 2011/Dec. 2012Nevada Dept. of TransportationGC Granite ConstructionDesign Atkins North America
19I-17 Cordes JunctionPrescott, Ariz.$65.2 millionAug. 2011/ June 2013Ariz. Dept. of TransportationDesign HDR Inc.GC Sundt Construction Heavy Civil Division/Vastco (JV)
20Northern Edge Navajo Nation Casino - Phase 1 Upper Fruitland, N.M.$60 millionMarch 2011/Jan. 2012Navajo Nation Gaming EnterpriseGC Arviso/Okland Construction JV
21University of Arizona North End Zone Stadium UpgradesTucson, Ariz.$56.9 millionDec. 2011/July 2013University of ArizonaDesign Heery Intl.GC Mortenson ConstructionCivil/MEP M3 Engineering
22Urban Outfitters West Coast E-Commerce Internet Fulfillment CenterReno, Nev.$50 millionJune 2011/June 2012Urban OutfittersDesign United Construction Co.GC United Construction Co.Developer Dermody Properties
23Advanced Wastewater Treatment Membrane/Ozonation Facilities Phase 1Las Vegas, Nev.$49.9 millionFeb. 2011/Feb. 2013Clark County Water Reclamation DistrictDesign MWH AmericaGC McCarthy Building Cos.
24Hilltop Townhomes & The Suites (NAU Residence Halls)Flagstaff, Ariz.$42 millionJuly 2011/Aug. 2012American Campus CommunitiesDesign Todd & AssociatesGC hardison/downey construction
25Arizona State University McCord Hall at the W. P. Carey School of BusinessTempe, Ariz.$38.4 millionOct. 2011/July 2013Arizona Board of Regents/ASUDesign Kohn Pedersen Fox Associates; RSP ArchitectsGC DPR Construction Inc.
----- Advertising -----

Keywords:

----- Advertising -----
Dodge Reports

Below is a brief listing of Projects Bidding in the South West. Click on any project to get Dodge Report, Plans and Specifications.

Click Here to See More Projects in the South West

Blog: From multiple ENR Southwest Bloggers
Our new blog delivers the latest project and people news, opinions and insights from the jobsite to the boardroom from the editors.
Reader Photos
Photos from Southwest Contractor Photo Showcase
Dodge Lead Center
FIND LOCAL
CONSTRUCTION PROJECTS
Search by Project Type & State



----- Advertising -----
 Reader Comments:

Sign in to Comment

To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.

We welcome comments from all points of view. Off-topic or abusive comments, however, will be removed at the editors’ discretion.