Located along the Price Corridor, Chandler Echelon is the first phase completed in this multi-phased 20-acre mixed-use project and includes a four-story Class A office building with 185,000 sq ft of rentable office space, an adjacent four-story pre-cast parking garage and associated site work. The project team’s collaborative approach led to an early completion, 52 days ahead of schedule.
The two-story open entrance lobby features stainless steel-coated plastic laminate accents, multi-colored and multi-textured marbleized granite flooring and a glass and steel hand-rail enclosing the lobby’s second story observation deck. Synthetic leather wallpaper, stainless steel, East Indian rosewood paper, rain glass wall accents mounted with exposed hardware and a variety of lighting features help complete the industrial look.
Owner: Lees Mayfield and Associates
Design Firm: Davis
General Contractor: The Weitz Co.
Engineers: TLCP Structural; Hawkins Design Group; Mechanical Designs; Erickson Meeks Engineering

Sign in to Comment
To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.