homepage home
subscribe to Southwest Contractor magazine subscribe
newsletters free e-newsletter
advertise
industry jobs industry jobs
Mcgraw Hill Construction
Southwest Contractor Logo
Order Your RISK FREE Subscription
comment

Intel Begins Construction on $300M R&D Facility at Chandler Campus

Text size: A A

Intel Corp. plans to add one more facility to its growing crop of buildings in Chandler, Ariz. The Santa Clara, Calif.-based manufacturer announced that construction is already underway on a new $300-million research and development facility at the Chandler Blvd. campus.

Photo by Patti Reznik Photography
Intel's new $300-million R&D facility is in addition to the already underway $5-billion Fab 42 manufacturing facility in Chandler, seen here.
----- Advertising -----

The new building will be used to expand Intel’s packaging operations. “The innovation set to take place within the walls of this new research center will influence technology trends for years to come, and we’re delighted to bring that distinction to the community of Chandler and the State of Arizona,” says Babak Sabi, Intel vice president and director of assembly and test technology development, in a statement.

In June, crews began excavating up to 16,000 cu yds of dirt for the two-story, 285,000-sq-ft facility. Other construction activity will include pouring 22,000 cu yds of concrete with 3,300 tons of rebar, erecting 4,200 tons of structural steel and installing 20 miles of electrical conduit. Construction expected to be completed in the second half of 2013. Company officials pledge to source many of the materials locally in Arizona.

The new building is designed to attain LEED certification. Last year, Intel attained LEED certification for the existing buildings at the campus, including all three generations of wafer-fabrication plants, support buildings and offices.

The facility is expected to create nearly a thousand construction jobs on top of the thousands of workers currently finishing up Intel’s $5-billion Fab 42 manufacturing facility in Chandler, last year's largest project start in the Southwest. The massive high-volume semiconductor manufacturing facility, constructed by Portland, Ore.-based Hoffman Construction, is scheduled for completion in 2013.

Keywords:

----- Advertising -----
Dodge Reports

Below is a brief listing of Projects Bidding in the South West. Click on any project to get Dodge Report, Plans and Specifications.

Click Here to See More Projects in the South West

Blog: From multiple ENR Southwest Bloggers
Our new blog delivers the latest project and people news, opinions and insights from the jobsite to the boardroom from the editors.
Reader Photos
Photos from Southwest Contractor Photo Showcase
Dodge Lead Center
Search for local construction projects OR CALL 877-234-4246 and get a FREE Lead Now!
Search by Project Type & State





----- Advertising -----
 Reader Comments:

Sign in to Comment

To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.

We welcome comments from all points of view. Off-topic or abusive comments, however, will be removed at the editors’ discretion.