News
 Arizona
 New Mexico
 Nevada
 Arizona History
 New Mexico History
 Nevada History
 Association
 Industry
 Green
 Submit News





Nevada News - April 2005

Hospital Work Tops Off

Kitchell Contractors recently topped off the steel structure that significantly expands the existing Sunrise Children's Hospital. The HCA facility, which sits on a joint campus with Sunrise Hospital & Medical Center, is located in central Las Vegas.

The 210,000-sq.-ft. tower addition consists of 110,000 sq. ft. of new construction and 100,000 sq. ft. of renovations to the existing hospital, including the addition of labor and delivery areas, C-section rooms, a neonatal intensive care unit (NICU), pediatric ICU, post partum unit, oncology unit, and staff lounge. The architect for this project is Las Vegas-based KGA Architecture.



Firm to Build Home Gallery

LM Construction Company of Las Vegas recently picked up Richmond American Homes new Home Gallery, to be located at 7770 S. Industrial Road - Suites 8,9,10 in the Safari Business Park - Phase II.

The new Las Vegas Home Gallery store will total 23, 000-sq.-ft., housing the home buyer's resource center and office staff.

The tenant improvement project is on schedule and slated for completion in late Spring

 


Design Starts on Air Force Project

KMA Architecture & Engineering (KMA) has begun designs for a 33,000-sq.-ft. vehicle maintenance facility at Nellis Air Force Base north of Las Vegas. KMA was retained by the general contractor, Straub Construction, Inc. as architect for the $10.9 million project that is owned by the United States Air Force.

In addition, the project includes a new wash area for military vehicles, loading dock and fire pump building. All designs will meet national anti-terrorism requirements as well as the standards maintained by Nellis Air Force Base.

The project team consists of Simon Pollard and Rey Zumarraga. Burkett & Wong provided structural engineering and civil engineering. The landscape architect is Garbini & Garbini.


Company Picks up Two Contracts

TWC Construction has been awarded its first contract from Nevada State Bank to build its newest branch at the intersection of Durango Drive and Badura Avenue. This 6,024-sq.-ft., branch, designed by Lucchesi Galati Architects, is located on a 1.5 acre site and will serve residents of Rhodes Ranch in the rapidly-growing southwest submarket near the I-215.

The contract is valued at $1.4 million and includes site preparation, steel and wood frame shell and interior improvements. Construction is expected to start at mid first quarter 2005 with a scheduled completion date early in the third quarter of this year.

TWC was also recently awarded a contract valued at $5.6 million to TWC Construction, Inc. for an industrial/flex concrete tilt-up building with related site work for ProLogis. The 214,200-sq.ft. building 6 is located on 4.75 acres at the Las Vegas Corporate Center, at Industrial Center Drive in North Las Vegas. Construction is scheduled to start during the first quarter 2005 with an anticipated completion date in the third quarter of this year. The Las Vegas Corporate Center is located in the rapidly-growing industrial corridor in North Las Vegas near Craig Road and I-15. The recent unprecedented boom in Valley land prices combined with easy access to major transportation routes has made this sector in North Las Vegas extremely attractive to industrial developers.

The architect on both projects is Blakely Johnson and Ghusn.


Work Ready to Start on Restaurant

Architecture firm Carpenter Sellers Associates (CSA) has completed construction documents for a new 4,900-sq.-ft. restaurant located at Warm Springs and Jones; Johnny Fontane's Pub & Pizzeria. This new pub was designed to reflect the owner's love of the look and feel of Italy. Exterior finishes of burnished plaster and stone create the warm, rich atmosphere of Italy while contemporary design elements lean toward a modern, clean feel. Bentar Construction will build the new restaurant. Tom Julian and Joey Scroppo of Quintessa II LLC are the owner/developers.

Public Safety Project Complete

CORE Construction recently announced the Las Vegas-based general contractor recently completed construction of the integrated Nevada Department of Transportation, Nevada Highway Patrol and Freeway Arterial Signal Technology facility.

The project, located at Decatur Boulevard and the 215 Beltway, covers approximately 13 acres and includes two buildings totaling 66,670 sq. ft., including a 10,485-sq.-ft. warehouse/maintenance facility.

The construction contract is estimated at approximately $10,750,000. CORE was contracted by the State of Nevada Public Works Board. The architect was KGA Architecture.


 Click here for more Nevada News >>



advertisement


 


Sponsors

© 2008 The McGraw-Hill Companies, Inc.
All Rights Reserved